11/2/20161. I already have the bottom rail of my front view and some cross beams done.
2. I plan to finish the majority of my front view today. 3. I have most of my top view done and my front view done. 4. I have to finish my top view, my bottom view, and add some detail. Bridge Design Day 1: Front view and part of top view11/4/161. I already have my front view done and part of my top view done.
2. Today I plan on finishing the top view of my bridge. 3.I have my front view completely done and my top view done. 4. I still have to add some detail to my top view and finish my bottom view. 11/7/20161. I already have my front view and most my top view done.
2. I plan to add detail to my top view and maybe start on my bottom view. 3. Today I finished my top view completely and started the beginnings of my bottom view. 4. I still have to finish my bottom view to complete my drawings. 11/9/20161. I already have my front, top, and the beginnings of my bottom view done.
2. I plan to finish most of my bottom view today. 3.Today i finished the majority of my bottom view with minor details remaining. 4. I still have to finish off my bottom view and dimension all my drawings. 11/14/20161. I already have my front and top view done with some dimensions.
2. Today i'm going to finish my bottom view and add dimensions to all my drawings. 3. Today I finished my bottom view, dimensioned my drawings, and started my budget. 4. I have to finish my budget and print my drawings to complete this stage of the project. 11/16/20161. I already have all my sketches done and am moving into the build phase of my project.
2. Today I plan to build by first rail for the bottom of my bridge. 3. Today I built the major pieces of my rail but have to glue the two ends together. 4. I still need to build the other rail, the sides, the top, and the bottom. 11/18/20161. I already have my sketches and most of my first rail done.
2. today I plan to finish both of the rails for the bottom of my bridge. 3. Today i finished building both my rails. 4. I still have to finish both side, the top, and the bottom of the bridge. 11/21/20161. I already have both my rails done.
2. Today i plan to get started on building one of the side of my bridge. 3. Today I finished most of the X's necessary for the side of my bridge. 4. I still need to glue them together, finished the other side, the top, and the bottom of my bridge. 11/28/20161. I already have my bottom rails done and have started my truss.
2. I plan to finish the majority of my trusses done for the sides for my bridge. 3. Today I finished the the majority of one side of my bridge. 4. I still need to build the other side, the bottom, and the top of my bridge. 11/30/20161. I already have my rails and part of my truss done on one side.
2. Today I plan to finish the truss on the right side of my bridge. 3. Today I finished the right side of my bridge and started on the left. 4. I still have to build the left side and the top and bottom of my bridge. 12/2/20161. I already have my rails and the truss for one side of my bridge done.
2. Today I plan to finish the left truss for my bridge. Today I finished the majority of the truss for the left side of my bridge. 4. I still have to finish the top and bottom of my bridge. |
|